§ How it works

From IFC to an audit-ready report — six steps.

No plugin, no setup. Drop your model files — the engine does the rest.

1

Drop your IFC

One file or a full federation: architecture, structure, MEP. Disciplines are auto-detected — from Revit, ArchiCAD, Vectorworks and more.

IFCARC · STR · MEP
2

The engine reads the code

An encoded Israeli-standard library: accessibility 1918, guardrails 1142, fire safety, shelter rooms (Mamad), plumbing, planning regulations. Every clause verified against the official PDF — 83/83.

SI 1918SI 1142SI 1212
3

Every finding — in 3D

A dimension arrow at the exact spot: measured vs. required, with the clause. The iron rule: FAIL only at full certainty — clause + measurement + attribution; otherwise an honest "verify". Our standard: zero false positives.

measured / required✓ ✗
4

Suggested fix, with cost

Every failed check comes with actionable remediation options and a material cost estimate — not just a red flag.

fix optionscost estimate
5

Cross-discipline coordination

ARC + STR + MEP clashes with penetration depth in mm, clustered per real pipe run — not five alerts for one pipe.

penetration mmBCF
6

Export & submit

A Hebrew compliance report (PDF) with a model snapshot per finding, a standard BCF file for your BIM tools, a quantities workbook (Excel), and a dynamic 0–100 permit-readiness score. The report slots into the submitter's existing filing.

PDFBCFXLSX0–100 score

Hybrid by design: heavy processing runs locally on your machine (Desktop), while tracking, management and report-sharing live in the cloud (SaaS).

§ What we check

The clauses that fail a project — encoded.

Accessibility

SI 1918

Accessible routes, clear door width, headroom, accessible WC.

Guardrails

SI 1142

Heights measured geometrically from the walking surface; infill gaps.

Stairs

planning regs

Riser / tread, flight length, width, stair headroom.

Fire & egress

SI 1212

Egress travel distance, exit doors, fire-rated doors.

Shelter room · Mamad

HFC regs

Net area, minimum width, wall thickness.

Plumbing

SI 1205

Drainage & sanitary systems.

MEP coordination

clash

Beam-pipe penetrations, electric-water separation.

Quantities

BoQ

Revit-grade take-off: Family & Type + Material Takeoff.

The library grows continuously — a new rule ships only after verification against the standards.

The engine is running. Give it a model.

Book a 30-minute demo — I'll run TofesBIM on your model, live. Now securing our first Israeli pilot partners: architecture firms, their consultants, and contractors.

Matan Luzon · Founder & Civil Engineer (B.Sc)